Une maintenance efficace des pompes de dragage A prominent dredging mill that uses nine Linatex® and two Warman® pumps to wash and separate different kinds of sand faced significant wear on their pumps due to the large amounts of crushed material used. 1 févr. 2023 Études de cas
Du colmatage aux économies : la transformation de l'installation d'une usine de recyclage A prominent plastic recycling company grappled with persistent clogging and inefficiency in their existing plastic deflaker pumps. 1 janv. 2023 Études de cas
Grandes pompes, maintenance minutieuse A dredge boat with two large Warman® 18x16 gravel pumps required yearly inspections and overhauls to maintain optimal performance and longevity. 1 déc. 2022
Changement complet pour une usine de recyclage de plastiques Within a demanding application in a plastic recycling plant, KSB’s KWP pumps failed after barely six months of service. 1 nov. 2022
Éviter les réparations risquées sur les pompes d'une sablière Our customer, who operates a sand quarry, contacted Vaikon for urgent intervention on one of their Linatex® 300x250 IIIr pumps. 1 oct. 2022
Pompes de tunnel : de l'usure à la renaissance A client approached Vaikon with four Warman® 6x6 EEG pumps requiring complete refurbishment within four weeks. 1 sept. 2022
Sélection de pompes pour une usine de recyclage de plastiques A loyal customer approached Vaikon for assistance with dimensioning and selecting pumps for their new, state-of-the-art plastic recycling installation. 1 juil. 2022
Conception d'un socle de pompe pour un filtre à bandes During periodic maintenance at a client’s site, Vaikon detected that the rigidity of a long-coupled water pump feeding a screen belt press had become inadequate. 1 juin 2022
Solution de pompage mobile pour l'assèchement d'un bassin de carrière During periodic maintenance at a client’s site, Vaikon detected that the rigidity of a long-coupled water pump feeding a screen belt press had become inadequate. 1 juin 2022
Alignement réussi sur site d'une pompe principale 8/6 A global player in the extraction of raw materials reported severe vibrations and seal leakage in a main Warman® 8/6 pump at one of their quarries. 1 mai 2022
Passage aux pompes submersibles Minto A global building materials manufacturer active in over 40 countries faced frequent failures with their submersible pumps. 1 avr. 2022
Pièces hydrauliques livrées en moins d'une heure One of the largest soil remediation plants in the Benelux faced an urgent issue when a crucial slurry pump failed. 1 mars 2022