Îmbunătățirea siguranței la întreținerea pompelor în reciclarea zgurii de la incinerare How a custom hoisting solution and drive upgrade made pump maintenance safer and more accessible in a bottom ash recycling plant. 18 mar. 2026
Soluție personalizată cu pompă submersibilă A Belgian marine & foundation contractor needed a pump able to match their existing unit and operate at 60 m depth, requiring a mobile, robust, frequency‑controlled solution. 2 mar. 2026 Studii de caz
Înlocuirea de urgență a unei pompe A global construction materials company faced an urgent challenge when its critical filter press feed pump failed, shutting down aggregate production and causing costly downtime. 17 feb. 2026 Studii de caz
De la debit redus la performanță ridicată A global advanced‑materials company faced too‑low wastewater pump capacity (10 vs. 100 m³/h). They needed a higher‑flow solution without altering existing piping. 13 ian. 2026 Studii de caz
Transferul laptelui de var fără înfundări A Hungarian steel galvanizing plant struggled with clogging and failing plastic pumps for lime milk transfer. They needed a more robust, clog‑resistant slurry‑pump solution. 5 dec. 2025 Studii de caz
Rotor optimizat CFD cu durată de viață dublă față de OEM Two booster pumps, one dredging line, identical duty – one clear winner. 27 nov. 2025 Studii de caz
Maximizarea recuperării nisipului fin în reciclarea solului When fines become losses, it's time to rethink the process. A soil recycling company was losing too much fine sand in its filter cake, driving up processing costs. 23 iul. 2025 Studii de caz
Pregătit pentru următoarea ploaie torențială To deal with heavy rainfall on a 5-hectare industrial site, our client required a pumping setup capable of handling 1540 m³/h, enough to process a 10-minute storm with a 2-year return period. 27 iun. 2025 Studii de caz
Din nou în funcțiune, de data aceasta fără scurgeri After the winter shutdown, a mineral processing site in Romania resumed operations. One of their Linatex pumps (Linapump IIIr) immediately showed signs of failure: the dry gland assembly was leaking heavily. 18 iun. 2025 Studii de caz
Transportul cartofilor prăjiți, cu o abordare diferită A key player in the potato products industry faced a challenge: their worn-out pumps were struggling to transport freshly cut fries through the production line without them breaking. 18 iun. 2025 Studii de caz
Fermentatorul de biogaz menținut în funcțiune For a biogas plant handling swill as digester feed, the original rotary lobe pump proved to be no match for the abrasive and chunky nature of the feed material. 18 iun. 2025 Studii de caz
Mai adânc pentru performanțe mai bune A local tunneling company faced a new international challenge. Their current equipment just wasn’t up to the tough job ahead. 18 iun. 2025 Studii de caz