Isot pumput, huolellinen huolto A dredge boat with two large Warman® 18x16 gravel pumps required yearly inspections and overhauls to maintain optimal performance and longevity. 1.12.2022 Asiakastapaukset
Täydellinen vaihto muovinkierrätyslaitokselle Within a demanding application in a plastic recycling plant, KSB’s KWP pumps failed after barely six months of service. 1.11.2022 Asiakastapaukset
Riskialttiiden korjausten välttäminen hiekkalouhoksen pumpuissa Our customer, who operates a sand quarry, contacted Vaikon for urgent intervention on one of their Linatex® 300x250 IIIr pumps. 1.10.2022 Asiakastapaukset
Tunnelipumput: kuluneista uudestisyntyneiksi A client approached Vaikon with four Warman® 6x6 EEG pumps requiring complete refurbishment within four weeks. 1.9.2022 Asiakastapaukset
Pumppujen valinta muovinkierrätyslaitokselle A loyal customer approached Vaikon for assistance with dimensioning and selecting pumps for their new, state-of-the-art plastic recycling installation. 1.7.2022 Asiakastapaukset
Pumpun alusta seulahihnapuristimeen During periodic maintenance at a client’s site, Vaikon detected that the rigidity of a long-coupled water pump feeding a screen belt press had become inadequate. 1.6.2022 Asiakastapaukset
Liikuteltava pumppuratkaisu louhoksen altaan tyhjennykseen During periodic maintenance at a client’s site, Vaikon detected that the rigidity of a long-coupled water pump feeding a screen belt press had become inadequate. 1.6.2022 Asiakastapaukset
Pää-8/6-pumpun onnistunut linjaus paikan päällä A global player in the extraction of raw materials reported severe vibrations and seal leakage in a main Warman® 8/6 pump at one of their quarries. 1.5.2022 Asiakastapaukset
Siirtyminen Minto-uppopumppuihin A global building materials manufacturer active in over 40 countries faced frequent failures with their submersible pumps. 1.4.2022 Asiakastapaukset
Märkäosat toimitettu tunnissa One of the largest soil remediation plants in the Benelux faced an urgent issue when a crucial slurry pump failed. 1.3.2022 Asiakastapaukset
Liikkuvan hiekanerotuslaitoksen onnistunut seisokki A prominent raw materials company relies on meticulous planning and execution for the semi-annual maintenance of its mobile sand separation plant. 1.2.2022 Asiakastapaukset
Raskasväliaine-erotteisen hiilenerotuslaitoksen uudistus With only three months to go until the annual shutdown, our loyal customer sought an alternative slurry pump distributor for their coal separation plant. 1.1.2022 Asiakastapaukset