Konttiin rakennettu vedenjakelu maaperän kierrätyslaitokselle A soil recycling site in Belgium needed four water sources routed to eight consumers. Vaikon built a containerized station with constant pressure and metered outlets. 21.10.2026
Muutos, joka pitää virtauksen käynnissä A metal recycling site in Belgium kept losing filter press uptime to a failing diaphragm pump. Vaikon replaced it with a Schegler Fasto centrifugal pump. 21.8.2026
Hienoaineksen talteenottojärjestelmä hiekan ja kiviaineksen käsittelyyn A Hungarian aggregate producer needed to capture fine particles and reduce water losses. See how Vaikon delivered a complete fines recovery module with hydrocyclone and slurry pump. 31.7.2026
Kulutusosien laatutesti metallikuonan kierrätyslaitoksella A metal slag recycling plant in Belgium challenged Vaikon to prove the quality of Schegler wear parts in a no-cure no-pay test. After three months in one of the most abrasive slurry processes in the industry, the result spoke for itself. 29.7.2026
Monipumpputoimitus jatkuvaan liuotusprosessiin How a continuous leaching process gets reliable, leak-free pumping: a multi-pump Vaikon package in 424 alloy, built for abrasive, acidic slurry. 17.6.2026
Duplex-lietepumpun vaihto sinkinkäsittelylaitoksella Eliminating leakage and acid attack through correct material selection and sealing technology. 16.6.2026
Värähtelymittaus ennakoivaan pumppujen kunnossapitoon Vibration monitoring used to catch early bearing wear and turn reactive pump maintenance into a planned, cost-controlled process. 22.5.2026
Kuiva tiivistepesä sakeuttimen alitteen pumppaukseen Solving recurring seal failures on a thickener underflow pump by replacing a standard gland seal with a dry gland seal designed for high suction static head conditions. 13.5.2026
Kaukana olevat pumput voideltuina automaattisella Pulsa-voitelulla Manual greasing of remote slurry pumps causes bearing failures. See how Vaikon eliminated lubrication-related downtime with a Pulsa™ automatic greasing system. 24.4.2026
Kavitaation vähentäminen korkean lämpötilan lietepumppauksessa Recurring cavitation at 90°C caused rapid wear and downtime. See how Vaikon solved it with a Schegler Vigor 6x4 and full-bore knife gate valves. 16.4.2026
Paineenkorotusasemasovellus Pushing 550 tonnes of sand and gravel per hour through 3.5 km of pipeline. How we do that? Download our white paper and discover everything about the Booster Station Application. White paper 9.4.2026 Blogi
Sykloninsyötön suorituskyvyn palauttaminen kumivuoratuilla pumpun varaosilla How upgraded rubber-lined spares restored full cyclone feed pressure and efficiency at a sand and gravel plant in Hungary. 2.4.2026