Multi-pump delivery for continuous leaching process How a continuous leaching process gets reliable, leak-free pumping: a multi-pump Vaikon package in 424 alloy, built for abrasive, acidic slurry. Jun 17, 2026 Case Studies
Duplex slurry pump replacement at zinc processing plant Eliminating leakage and acid attack through correct material selection and sealing technology. Jun 16, 2026 Case Studies
Vibration monitoring for proactive pump maintenance Vibration monitoring used to catch early bearing wear and turn reactive pump maintenance into a planned, cost-controlled process. May 22, 2026 Case Studies
Dry gland seal for thickener underflow pumping Solving recurring seal failures on a thickener underflow pump by replacing a standard gland seal with a dry gland seal designed for high suction static head conditions. May 13, 2026 Case Studies
Keeping remote pumps lubricated with automated Pulsa greasing Manual greasing of remote slurry pumps causes bearing failures. See how Vaikon eliminated lubrication-related downtime with a Pulsa™ automatic greasing system. Apr 24, 2026 Case Studies
Reducing cavitation in high temperature slurry pumping Recurring cavitation at 90°C caused rapid wear and downtime. See how Vaikon solved it with a Schegler Vigor 6x4 and full-bore knife gate valves. Apr 16, 2026 Case Studies
Booster Station Application Pushing 550 tonnes of sand and gravel per hour through 3.5 km of pipeline. How we do that? Download our white paper and discover everything about the Booster Station Application. Apr 9, 2026 Blog
Restoring cyclone feed performance with rubberlined pump spares How upgraded rubber-lined spares restored full cyclone feed pressure and efficiency at a sand and gravel plant in Hungary. Apr 2, 2026 Case Studies
Improving pump maintenance safety in bottom ash recycling How a custom hoisting solution and drive upgrade made pump maintenance safer and more accessible in a bottom ash recycling plant. Mar 18, 2026 Case Studies
Custom submersible pump solution A Belgian marine & foundation contractor needed a pump able to match their existing unit and operate at 60 m depth, requiring a mobile, robust, frequency‑controlled solution. Mar 2, 2026 Case Studies
Emergency pump replacement A global construction materials company faced an urgent challenge when its critical filter press feed pump failed, shutting down aggregate production and causing costly downtime. Feb 17, 2026 Case Studies
From low flow to high performance A global advanced‑materials company faced too‑low wastewater pump capacity (10 vs. 100 m³/h). They needed a higher‑flow solution without altering existing piping. Jan 13, 2026 Case Studies