Containerisierte Wasserverteilung für einen Bodenrecyclingstandort A soil recycling site in Belgium needed four water sources routed to eight consumers. Vaikon built a containerized station with constant pressure and metered outlets. 21.10.2026 Fallstudien
Ein Wechsel, der alles im Fluss hält A metal recycling site in Belgium kept losing filter press uptime to a failing diaphragm pump. Vaikon replaced it with a Schegler Fasto centrifugal pump. 21.08.2026 Fallstudien
Feinstoffrückgewinnung für die Sand- und Kiesaufbereitung A Hungarian aggregate producer needed to capture fine particles and reduce water losses. See how Vaikon delivered a complete fines recovery module with hydrocyclone and slurry pump. 31.07.2026 Fallstudien
Qualitätstest von Verschleißteilen in einer Metallschlacken-Recyclinganlage A metal slag recycling plant in Belgium challenged Vaikon to prove the quality of Schegler wear parts in a no-cure no-pay test. After three months in one of the most abrasive slurry processes in the industry, the result spoke for itself. 29.07.2026 Fallstudien
Lieferung mehrerer Pumpen für einen kontinuierlichen Laugungsprozess How a continuous leaching process gets reliable, leak-free pumping: a multi-pump Vaikon package in 424 alloy, built for abrasive, acidic slurry. 17.06.2026 Fallstudien
Ersatz durch eine Duplex-Schlammpumpe in einem Zinkverarbeitungswerk Eliminating leakage and acid attack through correct material selection and sealing technology. 16.06.2026 Fallstudien
Schwingungsüberwachung für proaktive Pumpenwartung Vibration monitoring used to catch early bearing wear and turn reactive pump maintenance into a planned, cost-controlled process. 22.05.2026 Fallstudien
Trockendichtung für die Förderung des Eindickerunterlaufs Solving recurring seal failures on a thickener underflow pump by replacing a standard gland seal with a dry gland seal designed for high suction static head conditions. 13.05.2026 Fallstudien
Entlegene Pumpen mit automatischer Pulsa-Schmierung geschmiert halten Manual greasing of remote slurry pumps causes bearing failures. See how Vaikon eliminated lubrication-related downtime with a Pulsa™ automatic greasing system. 24.04.2026 Fallstudien
Kavitation beim Fördern heißer Schlämme reduzieren Recurring cavitation at 90°C caused rapid wear and downtime. See how Vaikon solved it with a Schegler Vigor 6x4 and full-bore knife gate valves. 16.04.2026 Fallstudien
Anwendung einer Booster-Station Pushing 550 tonnes of sand and gravel per hour through 3.5 km of pipeline. How we do that? Download our white paper and discover everything about the Booster Station Application. White paper 09.04.2026
Die Zyklonbeschickung mit gummiausgekleideten Pumpenersatzteilen wiederhergestellt How upgraded rubber-lined spares restored full cyclone feed pressure and efficiency at a sand and gravel plant in Hungary. 02.04.2026 Fallstudien