Rubber lining repair and relining
Worn rubber parts don't always need replacing: we repair them or reline them completely, for Linatex® and other rubber-lined pump and cyclone parts. Parts for Linatex® cyclones we supply new or repair.
3–4 weeks lead time

Repair rubber-lined pump parts
We add extra rubber where it has worn away, instead of buying new.
Supply all Linatex® cyclone parts
From inlet head to spigot and lipseal, for the complete SE series.
Repair cyclone parts
Housings, cones, vortex finders and spigots back in top condition.
Full relining
Old rubber completely removed and a new rubber layer applied to cyclone and rubber-lined parts.
In practice: before and after
BeforeWorn spigot lipseal
BeforeWorn rubber spigot
AfterNew lipseal and spigot, ready for delivery
In operationBack in operation at a sand and gravel producer
How relining works
You send us the part
We inspect the wear and send you a quotation: repair or replace.
Rubber removal and sandblasting
The old rubber is removed completely and the metal is blasted.
New rubber lining
Natural rubber 35 Shore A, in the thickness your application needs.
Finishing and delivery
Outside in anti-corrosion paint. Lead time 3 to 4 weeks.
Rubber-lined pump parts: here we don't remove all the rubber; we add extra rubber where it has worn away.
Linatex® cyclones in our range
| Type | Cone build-up | Parts |
|---|---|---|
| SE 1.5.06 | 1 cone | 14 |
| SE 2.09 | 1 cone | 14 |
| SE 2.12 | 1 cone | 14 |
| SE 3.15 | lower and middle cone | 15 |
| SE 4.18 | lower and middle cone | 15 |
| SE 5.24 | lower, middle and upper cone | 16 |
| SE 6.30 | lower, 2 middle and upper cone | 17 |
| SE 8.36 | lower, middle and upper cone | 16 |
| SE 10.36 | lower, middle and upper cone | 16 |
Per cyclone: inlet and outlet head, vortex finder, cones, spigot, spigot lipseal, measuring flange, separating membrane and tube, pressure gauge, overflow pipe (pipe, T-piece, sleeve) and cylindrical connection. 137 parts in total for 9 types.
Frequently asked questions
Often, yes. We inspect the wear and tell you whether repair or replacement makes sense. For pump parts we add extra rubber where it has worn away; cyclone and rubber-lined parts can be fully relined.
No. We repair and reline Linatex® parts and other rubber-lined pump and cyclone parts.
The old rubber is removed completely, the metal is sandblasted and a new layer of natural rubber 35 Shore A is applied in the thickness your application needs. The outside is finished in anti-corrosion paint.
The lead time is 3 to 4 weeks.
The SE series from SE 1.5.06 to SE 10.36: 9 types and 137 parts in total, from inlet head to spigot and lipseal.
Worn part? Send it to us.
We assess it and tell you whether it can be repaired, and what it costs.
Linatex® is a trademark of its respective owner. Vaikon is not affiliated with or an authorised distributor of this brand; the parts and repairs are suitable for the types mentioned.